RAM block recertification – perform major recertification of RAM blocks with COC from OEM/CEM.Long-term preservation – perform long-term preservation for cold stacking.Field/on-site rectification – including replacement of elastomers and pressure testing for the unit fitness certification.All ram BOPs are strictly manufactured as per API.
such as single ram BOP, double ram BOP, triple ram BOP, quadplex Ram BOP, are mainly hydraulic operated or manual operated. Pressure Drilling Manifold 2000 PSI Pressure Drilling Manifold 5000 PSI WP Electrical Instrmentation.
We are an authorised repair facility for various OEMs, where we do repair/recertification to various levels in accordance with API 16AR and NACE MR 0175 latest editions and meet OEM specifications.Ĭonformity of the quality of services provided on units we refurbish has been issued through a COC verification and is backed up by our OEM Partners.
We are one of the largest service providers for BOPs of various OEMs under the API16AR certification programme.Īs an APIQ1-certified facility, our policies and procedures are audited and verified by different partner OEMs to approve and validate the quality of service we provide as stipulated in API standards. Both systems are actuated hydraulically with manual interface.Īnnular BOPs are primary devices that are operated with a hydraulically energised packing element wrap around the drill string that creates a seal for the wellbore flow, whereas the RAM type BOPs are used to seal the wellbore during emergency situations – either to seal between the drill string and wellbore or to completely lock the wellbore by cutting the string in place. Test at the outermost edges of the shear blades of the shear ram positioning system per 30CFR 250.734(a)(16) and 30CFR 250.732(b)(1)(iv). There are two different types of BOPs generally used in this industry: Annular BOPs and RAM BOPs. Adhere to a 30-minute minimum requirement for high and low pressure sealing test time immediately following shear. Pressure control equipment, BOPs – part of the well control strategy – are critical components installed on top of the structure of the wells during drilling, completion, or workover operations to react with the positive sealing of the wellbore during various operational scenarios.